What is the lead time from order to installation?

Date: January 2, 2026Views: 5023

Lead times for a custom-configured hydraulic tensile testing machine are typically 16 to 24 weeks. This includes manufacturing of the load frame and power unit, assembly, factory acceptance testing (FAT), and ocean freight. Complex systems with dynamic controllers or large custom fixtures may take longer. It’s crucial to factor in this timeline and any site preparation work (like pouring a foundation) that must be completed before delivery.