What lab space and setup is required for installation?
Date: January 2, 2026Views: 2686
These are permanent installations requiring planning. Key requirements include:
-
A Solid, Level Floor: Typically reinforced concrete.
-
Adequate Footprint: Allow for the machine's base plus 2-3 feet of clearance on all sides for operator access and maintenance.
-
Power: Most models require 3-phase electrical power. Specific voltage and amperage will depend on the force capacity.
-
Environment: A stable, climate-controlled lab environment is recommended for optimal accuracy. Our team provides detailed site preparation guides and can often manage turnkey installation.




