What kind of laboratory space and preparation is required?

Date: January 2, 2026Views: 3585

A firm, level concrete floor is essential. The machine requires a defined footprint, access to standard three-phase electrical power (for higher-capacity models), and sufficient clearance for operator access and fixture handling. We provide detailed site preparation guidelines and can offer installation services.